WestConnex MOC2 Buildings

PROJECT TYPE

Public Infrastructure (Design & Engineer Stage Scaffolding System)

PROJECT LOCATION

WestConnex New M5 – MOC2 Buildings, Sydney NSW

DURATION

Jun 2018 – Current

CLIENT

PROJECT SUMMARY

The Bexley Motorway Operations Complex will be located within the existing M5 linear parkland alongside Bexley Road and will have an approximate height of 13 metres from ground level. The Bexley Motorway Operations Complex is designed to create minimal visual clutter with simple and elegant buildings that visually integrate into the surrounding parklands, from ground level its ventilation shaft will extend 25m to the tunnel floor.

In the early stages of this project An-CO provided a design and construct service to the concrete structures contractor on the construction of a 25m deep Ventialtion Shaft and the basement of a Substation Building. An-CO provided scaffold as formwork support for insitu concrete elements such as beams, columns and suspended floor slabs, along access scaffold for the installation of structural precast wall panels.

Later in the project An-CO provided a design and construct service to the client for external perimeter scaffold to two structures, a substation and a ventilation building that service the Ventilation Shaft. The scaffold was installed to facilitate the installation of structural steel, precast architectural façade panelling, M&E services and metal wall and roofing. Scaffold was also provided to the M&E teams to assist with access and support for installation of cabling, ducting, attenuators, dampers and extractor fans.